LIU Zhentao, SHANG Yanjun, SHAO Peng, WEI Siyu. ANALYSIS ON VARIATIONS OF DISPLACEMENT RATES UNDER INFLUENCES OF RAINFALL AND EXCAVATION—TAKING RIGHT BANK SLOPE OF GAOBEI KEY WATER CONTROL PROJECT AS CASE STUDY[J]. JOURNAL OF MECHANICAL ENGINEERING, 2020, 28(1): 122-131. doi: 10.13544/j.cnki.jeg.2019-294
Citation: LIU Zhentao, SHANG Yanjun, SHAO Peng, WEI Siyu. ANALYSIS ON VARIATIONS OF DISPLACEMENT RATES UNDER INFLUENCES OF RAINFALL AND EXCAVATION—TAKING RIGHT BANK SLOPE OF GAOBEI KEY WATER CONTROL PROJECT AS CASE STUDY[J]. JOURNAL OF MECHANICAL ENGINEERING, 2020, 28(1): 122-131. doi: 10.13544/j.cnki.jeg.2019-294

ANALYSIS ON VARIATIONS OF DISPLACEMENT RATES UNDER INFLUENCES OF RAINFALL AND EXCAVATION—TAKING RIGHT BANK SLOPE OF GAOBEI KEY WATER CONTROL PROJECT AS CASE STUDY

doi: 10.13544/j.cnki.jeg.2019-294
Funds:

the National Natural Science Foundation of China 41772320

SKLGP SKLGP2017K021

  • Received Date: 05 Jul 2019
  • Rev Recd Date: 10 Nov 2019
  • Publish Date: 25 Feb 2020
  • How to use the time schedule in case of heavy precipitation and undertaking intensive excavation of the retaining wall pit, and then upward backfilling the slope as permanent reinforcement, is the priority countermeasure in the tail canal project. The information construction depends on the analysis results of the deformation process and displacement vector relationship, from the primary landslide and then transformed to the cut slope. This paper takes the right bank slope of Gaobei Key Water Control Project as an example. It analyzes the monitoring data during the excavation of retaining wall foundation pit of the tail canal, It obtains the three-dimensional vector space-time variation relations of 55 monitoring points. It reveals the mechanism of clockwise compression-shearing consolidation drainage failure in the process of slope deformation. It bases on the correlation of precipitation data and obtains the corresponding relationship between slope deformation and precipitation, as well as excavation in 4 different stages. The statistical relationship between the average daily displacement rate and the daily precipitation is approximately as v=103.45ln(p)-82.821. The paper infers that during the period of non-strong rainfall, the displacement rate caused by excavation of the slope foot reached 200mm ·d-1, which is the key parameter of information construction. The above failure modes and monitoring analysis results provide a basis for the information construction of retaining wall beside the tail canal. As a result the landslide was mitigated and cut slope was reinforced as designed in a rainy season.

     

  • loading
  • Feng W K, Meng R, Li K, et al. 2019. Discussion on failure mechanism for complex movement of Shuimatuo landslide in Guizhou Province[J]. Journal of Engineering Geology, 27(3): 592-600. http://d.old.wanfangdata.com.cn/Periodical/gcdzxb201903015
    Gao L T, Yan E C, Liu K. 2014. Accumulation landslides under rainfall condition-a case from Chongqing[J]. Journal of Engineering Geology, 22(2): 263-271. http://d.old.wanfangdata.com.cn/Periodical/gcdzxb201402016
    Liu D Z. 1971. Regional geology survey report: Mei County sheet(scale 1: 200, 000)[R]. Guangzhou: Team No.1 of Regional Geology Survey, Guangdong Geological Bureau.
    Liu Y H, Liu L N. 2016. Rainfall-induced mechanism based early warning model for slopes of dualistic layers in weathered granitic area[J]. Journal of Engineering Geology, 24(4): 542-549. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=gcdzxb201604008
    Luo Y X. 2007. Formation, characteristics and prevention of the meteorological disasters in Meizhou[J]. Tropical Geography, 27(6): 505-510. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=rddl200706005
    Shang M, Liao F, Ma R, et al. 2019. Prediction of cumulative displacement of Bazimen landslide based on one-variable linear regression model[J]. Journal of Engineering Geology, 27(5): 1172-1178. https://www.sciencedirect.com/science/article/pii/S0013795217300856
    Tang J, He Y. 2017. Application of the dynamic design method in mitigation of Longjiayan Landsldie[J]. Transportation Science and Technology, (2): 38-41.
    Xu Y Z, Lu Y N, Li D Y, et al. 2016. GIS and information model based landslide susceptibility assessment in granite area of Guangxi ZAR[J]. Journal of Engineering Geology, 24(4): 693-703.
    Yang F, Xu Q, Fan X M, et al. 2019. Prediction of landslide displacement time series based on Support Vector Regression Machine with Artificial Bee Colony algorithm[J]. Journal of Engineering Geology, 27(4): 880-889. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=gcdzxb201904022
    Yang Z F, Shang Y J, Wang S J, et al. 2001. Engineering geomechanical analysis and monitoring control in design and construction of the Wuqiangxi shiplock slope, China[J]. Engineering Geology, 59(1-2): 59-72. doi: 10.1016/S0013-7952(00)00062-4
    Yin Y P. 2010. Mechanism of apparent dip slide of inclined bedding rockslide-a case study of Jiweishan Rockslide in Chongqing[J]. Chinese Journal of Rock Mechanics and Engineering, 29(2): 217-226. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=yslxygcxb201002001
    Zhang X J. 2010. One of the introduction of regional geological structures in Guangdong-introduction of fault features[J]. Guangdong Highway Survey and Design, (3): 31-36.
    Zhang Z L. 2019. Design scheme for treatment of geological safety hidden danger in the right bank with road to the dam of the Gaobei Water Control Project, Hanjiang River[R]. Guangzhou: Institute of Water Conservancy and Electricity Survey and Design, Guangdong Province.
    Zhao Y H, Fan X Y, Wang H G, et al. 2017. Effect of initial shear stress and phase difference on dynamic characteristics of saturated sand[J]. Yangtze River, 48(3): 48-52. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=rmcj201703015
    冯文凯, 孟睿, 李坤, 等. 2019.贵州省水麻坨滑坡的复杂运动破坏机制探讨[J].工程地质学报, 27(3): 592-600. doi: 10.13544/j.cnki.jeg.2018-025
    高连通, 晏鄂川, 刘珂. 2014.考虑降雨条件的堆积体滑坡多场特征研究[J].工程地质学报, 22(2): 263-271. doi: 10.3969/j.issn.1004-9665.2014.02.016
    刘殿左. 1971.中华人民共和国区域地质调查报告: 梅县幅(比例尺1 ︰ 20万)[R].广州: 广东省地质局区域地质调查队一分队.
    刘艳辉, 刘丽楠. 2016.基于诱发机理的降雨型滑坡预警研究-以花岗岩风化壳二元结构斜坡为例[J].工程地质学报, 24(4): 542-549. doi: 10.13544/j.cnki.jeg.2016.04.008
    罗迎新. 2007.梅州市气象灾害的形成、特征及其防治[J].热带地理, 27(6): 505-510. doi: 10.3969/j.issn.1001-5221.2007.06.005
    尚敏, 廖芬, 马锐, 等. 2019.基于一元线性回归模型八字门滑坡累积位移预测[J].工程地质学报, 27(5): 1172-1178. doi: 10.13544/j.cnki.jeg.2019021
    唐军, 何云. 2017.动态设计法在龙家岩滑坡治理工程中的应用实例[J].交通科技, (2): 38-41. http://d.old.wanfangdata.com.cn/Periodical/sykjxx201702012
    许英姿, 卢玉南, 李东阳, 等. 2016.基于GIS和信息量模型的广西花岗岩分布区滑坡易发性评价[J].工程地质学报, 24(4): 693-703. doi: 10.13544/j.cnki.jeg.2016.04.027
    杨帆, 许强, 范宣梅, 等. 2019.基于时间序列与人工蜂群支持向量机的滑坡位移预测研究[J].工程地质学报, 27(4): 880-889. doi: 10.13544/j.cnki.jeg.2017-256
    殷跃平. 2010.斜倾厚层山体滑坡视向滑动机制研究-以重庆武隆鸡尾山滑坡为例[J].岩石力学与工程学报, 29(2): 217-226.
    张修杰. 2010.广东省区域地质构造简介之一-断裂特征介绍[J].广东公路勘察设计, (3): 31-36. http://www.cqvip.com/Main/Detail.aspx?id=35653145
    张诸林. 2019.广东省韩江高陂水利枢纽工程右岸上坝道路山体地质安全隐患处理设计方案[R].广州: 广东省水利电力勘测设计研究院.
    赵运会, 樊晓一, 王海瓜, 等. 2017.偏转型滑坡滑动与堆积影响因素研究[J].人民长江, 48 (3): 48-52. http://d.old.wanfangdata.com.cn/Periodical/rmcj201703010
  • 加载中

Catalog

    Figures(11)  / Tables(1)

    Article Metrics

    Article views(173) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return